Setting Target Rates for Construction Activity Analysis Categories

dc.contributor.authorShahtaheri, Maryam
dc.date.accessioned2012-04-24T20:18:18Z
dc.date.available2012-04-24T20:18:18Z
dc.date.issued2012-04-24T20:18:18Z
dc.date.submitted2012-03-16
dc.description.abstractThis thesis is focused on increasing productive actions in construction by a procedure known as Activity Analysis. Activity Analysis is a continuous productivity improvement tool for identifying barriers to site productivity with the goal of decreasing them and thereby increasing the direct work rate. A preceding study validated this approach, however it had two limitations. No reevaluation was conducted on projects in Canada by the authors, and not enough resources or data were available to understand behaviour of the activity rates in absolute value terms across many projects. Based on three case studies and data collected over 17 days by the author and a colleague, Activity Analysis was validated as being applicable in Canadian conditions. A desired value, known as a target rate, was then studied in order to be able to set expectations with respect to the productivity to be achieved in each cycle. The premise behind setting a “target rate” is that 100% direct work is neither possible nor desirable, since some time must always be spent on communications and planning. However, a higher direct work rate is generally better than a lower rate. Thus, a target rate is needed. A mathematical model called ANFIS was developed as a means of setting the desired level of activities. Through consideration of a variety of factors that affect labour productivity, the developed model was trained based on 65 data points. The model was found to be easy to use and flexible enough to be appropriate for all of the factors considered. Based on the data points available from 5 different past projects and 3 recent projects and the experience associated with these projects, three additional methods of defining the target rate were developed. The impact of these results is that companies now have appropriate methods and an initial data set for industrial construction in order to establish target rates for direct work and supporting activities. This should help reduce project costs and improve productivity.en
dc.identifier.urihttp://hdl.handle.net/10012/6640
dc.language.isoenen
dc.pendingfalseen
dc.publisherUniversity of Waterlooen
dc.subjectactivity analysisen
dc.subjectdirect work rateen
dc.subjectproductivityen
dc.subjecton-site work improvementen
dc.subjecttarget rates for different tradesen
dc.subjectANFISen
dc.subjectexperience based modelsen
dc.subjecton-site work evaluationen
dc.subject.programCivil Engineeringen
dc.titleSetting Target Rates for Construction Activity Analysis Categoriesen
dc.typeMaster Thesisen
uws-etd.degreeMaster of Applied Scienceen
uws-etd.degree.departmentCivil and Environmental Engineeringen
uws.peerReviewStatusUnrevieweden
uws.scholarLevelGraduateen
uws.typeOfResourceTexten

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Shahtaheri_Maryam.pdf
Size:
4.14 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
254 B
Format:
Item-specific license agreed upon to submission
Description: