Distribution System Planning with Distributed Generation: Optimal versus Heuristic Approach

dc.comment.hiddenThe numbers that appear along the right margin (for example please see the right margin on pages 17-20 or 32-34) are equation numbers.en
dc.contributor.authorBin Humayd, Abdullah
dc.date.accessioned2011-05-04T13:39:53Z
dc.date.available2011-05-04T13:39:53Z
dc.date.issued2011-05-04T13:39:53Z
dc.date.submitted2011-04-11
dc.description.abstractDistribution system design and planning is facing a major change in paradigm because of deregulation of the power industry and with rapid penetration of distributed generation (DG) sources. Distribution system design and planning are key features for determining the best expansion strategies to provide reliable and economic services to the customer. In classical planning, the load growth is typically met by adding a new substation or upgrading the existing substation capacity along with their feeders. Today, rapid advances in DG technology and their numerous benefits have made them an attractive option to the distribution companies, power system planners and operators, energy policy makers and regulators, as well as developers. This thesis first presents a comprehensive planning framework for the distribution system from the distribution company perspective. It incorporates DG units as an option for local distribution companies (LDCs) and determines the sizing, placement and upgrade plans for feeders and substations. Thereafter, a new heuristic approach to multi-year distribution system planning is proposed which is based on a back-propagation algorithm starting from the terminal year and arriving at the first year. It is based on cost-benefit analysis, which incorporates various energy supply options for LDCs such as DG, substations and feeders and determines the size, placement and upgrade plan. The proposed heuristic approach combines a bi-level procedure in which Level-1 selects the optimal size and location of distribution system component upgrades and Level-2 determines the optimal period of commissioning for the selected upgrades in Level-1. The proposed heuristic is applied to a 32-bus radial distribution system. The first level of the distribution system planning framework is formulated as a mixed integer linear programming (MILP) problem while the second level is a linear programming (LP) model. The results demonstrate that the proposed approach can achieve better performance than a full optimization for the same distribution system.en
dc.identifier.urihttp://hdl.handle.net/10012/5917
dc.language.isoenen
dc.pendingfalseen
dc.publisherUniversity of Waterlooen
dc.subjectDistributed generationen
dc.subjectdistribution system planningen
dc.subject.programElectrical and Computer Engineeringen
dc.titleDistribution System Planning with Distributed Generation: Optimal versus Heuristic Approachen
dc.typeMaster Thesisen
uws-etd.degreeMaster of Applied Scienceen
uws-etd.degree.departmentElectrical and Computer Engineeringen
uws.peerReviewStatusUnrevieweden
uws.scholarLevelGraduateen
uws.typeOfResourceTexten

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Bin_Humayd_Abdullah.pdf
Size:
890.32 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
256 B
Format:
Item-specific license agreed upon to submission
Description: