Show simple item record

dc.contributor.authorIcyk, Bryanen
dc.date.accessioned2007-05-08 13:54:22 (GMT)
dc.date.available2007-05-08 13:54:22 (GMT)
dc.date.issued2006en
dc.date.submitted2006en
dc.identifier.urihttp://hdl.handle.net/10012/2899
dc.description.abstractThis thesis examines the private and external costs of electricity generated in Ontario by natural gas, wind, refurbished nuclear and new nuclear power. The purpose of the assessment is to determine a capacity expansion plan that meets the forecasted electricity supply gap in Ontario at the lowest social costs (i. e. the lowest aggregated private and external costs). A levelized unit electricity cost (LUEC) analysis is employed to evaluate private costs under both public and merchant perspectives. Computable external costs are monetized by adapting estimates from the literature that were previously developed using a primarily bottom-up damage cost method. <br /><br /> The findings reveal that social cost estimates for nuclear refurbishment are the lowest of the generation alternatives studied regardless of the evaluation perspective. Therefore, if the capacity expansion decision were based solely on these estimates, nuclear refurbishment should be utilized until its capacity constraints are reached. The generation alternative with the second lowest social costs depends on the perspective from which private costs are evaluated: from a public perspective, the remainder of the supply gap should be filled by new nuclear generation and from a merchant perspective, which is assumed to be more reflective of the current Ontario electricity market, natural gas-fired generation should be used. <br /><br /> Due to inherent uncertainty and limitations associated with the estimation of social costs, the estimates obtained in this thesis are considered to be context and data specific. A sensitivity analysis, which is employed to attempt to mitigate some of the uncertainty, shows that changes to key variables alter the capacity expansion plan. This reinforces the observation that methods and assumptions significantly affect social cost estimates. <br /><br /> Despite the limitations of this kind of evaluation, it is argued that a social cost assessment that is consistent, transparent and comprehensive can be a useful tool to assess the trade-offs of electricity generation alternatives if used along with existing evaluation criteria. Such an assessment can increase the likelihood that actual social costs are minimized, which can steer electricity generation in Ontario towards a system that is more efficient and sustainable.en
dc.formatapplication/pdfen
dc.format.extent1387692 bytes
dc.format.mimetypeapplication/pdf
dc.language.isoenen
dc.publisherUniversity of Waterlooen
dc.rightsCopyright: 2006, Icyk, Bryan. All rights reserved.en
dc.subjectEnvironmental Studiesen
dc.subjectsocial costsen
dc.subjectexternalitiesen
dc.subjectlevelized unit electricity cost (LUEC) analysisen
dc.subjectelectricity generationen
dc.subjectsustainable developmenten
dc.titleAt What Cost? A comparative evaluation of the social costs of selected electricity generation alternatives in Ontarioen
dc.typeMaster Thesisen
dc.pendingfalseen
uws-etd.degree.departmentEnvironment and Resource Studiesen
uws-etd.degreeMaster of Environmental Studiesen
uws.typeOfResourceTexten
uws.peerReviewStatusUnrevieweden
uws.scholarLevelGraduateen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record


UWSpace

University of Waterloo Library
200 University Avenue West
Waterloo, Ontario, Canada N2L 3G1
519 888 4883

All items in UWSpace are protected by copyright, with all rights reserved.

DSpace software

Service outages