Show simple item record

dc.contributor.authorAhmad, Farhan
dc.date.accessioned2019-07-03 17:49:08 (GMT)
dc.date.available2019-07-03 17:49:08 (GMT)
dc.date.issued2019-07-03
dc.date.submitted2019-06-26
dc.identifier.urihttp://hdl.handle.net/10012/14788
dc.description.abstractThere are three general approaches for the mitigation of carbon emissions from fossil fuel fired power plants; pre-combustion, oxyfuel and post-combustion carbon capture. The post-combustion absorption process using MEA (methyl-ethanol-amine) is selected for this work due to its maturity in research and capability of it being retrofitted on existing power plants. Previous research included work on solvent development selections, model development, steady state simulation, dynamic simulation and control and optimization. A rigorous dynamic model used in this work is based on the model developed by (Nittaya, 2014) and (Harun, 2012) and includes six PI controllers implemented in gProms v5.1. 80% of the energy cost requirements by post combustion carbon capture system (PCCCS) are for the solvent regeneration. Due to the fluctuation in the electricity demand, appropriate scheduling of the PCCCS can reduce operating costs associated with carbon capture as demonstrated by (Alie, 2013). Controller performance analysis usually involves either disturbance rejection or servo-control tests but not a combination of both scenarios. Since the %CC schedule was developed to compliment a power generation schedule that generates flue-gas accordingly, this work evaluates the controller in the presence of both flue gas disturbances and %CC set-point changes simultaneously. It was found that the flue gas disturbances worked in favour of achieving the desired set-points and the controller performed better (~53%) than when evaluated without the influence of the disturbance. This work showed that tuning the controller for the intended schedule improved the response of the controller by about ~58% over the IMC tuned controller (that was estimated around similar operating conditions). It was determined that following the proposed schedule resulted in a decrease of 7% in energy consumption in comparison with capturing at a fixed capture rate. Fluctuations in the day-to-day electricity demand can be modelled using a correlation between the proposed schedule and the power generated. This work proposed a linear correlation between the two that resulted in a similar set-point schedule being generated. In conclusion, a series of PI controllers may be used to control the highly non-linear MEA based post-combustion carbon capture process provided the controllers are tuned in accordance to the set-point schedule.en
dc.language.isoenen
dc.publisherUniversity of Waterlooen
dc.subjectCO2en
dc.subjectcarbon captureen
dc.subjectflexible carbon captureen
dc.subjectschedulingen
dc.subjectcarbon capture controlen
dc.subjectsimulationen
dc.titleDynamic Scheduling and Control of MEA Absorption Processes for CO2 Capture Using gPromsen
dc.typeMaster Thesisen
dc.pendingfalse
uws-etd.degree.departmentChemical Engineeringen
uws-etd.degree.disciplineChemical Engineeringen
uws-etd.degree.grantorUniversity of Waterlooen
uws-etd.degreeMaster of Applied Scienceen
uws.contributor.advisorDouglas, Peter
uws.contributor.affiliation1Faculty of Engineeringen
uws.published.cityWaterlooen
uws.published.countryCanadaen
uws.published.provinceOntarioen
uws.typeOfResourceTexten
uws.peerReviewStatusUnrevieweden
uws.scholarLevelGraduateen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record


UWSpace

University of Waterloo Library
200 University Avenue West
Waterloo, Ontario, Canada N2L 3G1
519 888 4883

All items in UWSpace are protected by copyright, with all rights reserved.

DSpace software

Service outages