Construction Scheduling using Critical Path Analysis with Separate Time Segments
(University of Waterloo, 2010-08-06)Project managers today rely on scheduling tools based on the Critical Path Method (CPM) to determine the overall project duration and the activities’ float times. Such data provide important information about the degree ... -
Improved Schedule Analysis Considering Rework Impact and Optimum Delay Mitigation
(University of Waterloo, 2009-12-11)Rework has been a primary cause of cost and schedule overruns in the construction of heavy industrial projects such as those related to oil and gas. It has been reported that the direct cost of rework is about 5% of total ...