Show simple item record

dc.contributor.authorAldhubaib, Hani
dc.date.accessioned2013-01-25 20:17:58 (GMT)
dc.date.available2013-01-25 20:17:58 (GMT)
dc.date.issued2013-01-25T20:17:58Z
dc.date.submitted2013
dc.identifier.urihttp://hdl.handle.net/10012/7313
dc.description.abstractDeregulated and competitive power market places utilities under high pressure to assure providing power with a satisfactory level of power continuity. This objective entails a high level of reliability which in turn demands a high financial budget for design, operation, and maintenance. Therefore, the need for utilities to balance these factors has been increasing to become the core of a utility's asset management activities. Maintenance is a key aspect of asset management. The main objective of maintenance is to extend the lifetime of equipment and/or reduce the probability of failure. Maintenance activities play an important role in improving system reliability by keeping the condition of a system's equipment within an acceptable level. Generally speaking, technical requirements and budget constraints are the most influential factors in assigning maintenance activities. The most cost-effective maintenance approach is the approach that can sustain a high level of reliability while maintenance cost is minimized. The transformer has a significant role in the power system due to its remarkable effect on the overall level of reliability in addition to its extensive investments in the power grid. Transformer management is comprised of identifying the appropriate type and frequency to maintain the transformer, and the appropriate time to replace the transformer in a cost-effective manner. The essential objective of this thesis is to introduce a novel framework for transformer management. An approach which links maintenance and replacement decisions is presented in this thesis. This approach proposes a methodical decision-making system to determine the optimal time to replace the transformer. Indeed, the proposed approach essentially investigates the cost-effectiveness of replacing the transformer both before and after the lifetime is extended by maintenance. To properly investigate the effect of maintenance, maintenance activities should first be scheduled effectively. Therefore, this approach introduces a maintenance strategy based on reliability-centered maintenance (RCM) concept and genetic algorithm (GA) to optimally schedule maintenance activities. Two replacement studies are conducted: with and without the effect of maintenance. A comparison between replacement studies is discussed in the proposed approach.en
dc.language.isoenen
dc.publisherUniversity of Waterlooen
dc.subjectAsset Managementen
dc.subjectReliabilityen
dc.subjectMaintenanceen
dc.titleReliability-Centered Maintenance and Replacement for Transformeren
dc.typeMaster Thesisen
dc.pendingfalseen
dc.subject.programElectrical and Computer Engineeringen
uws-etd.degree.departmentElectrical and Computer Engineeringen
uws-etd.degreeMaster of Applied Scienceen
uws.typeOfResourceTexten
uws.peerReviewStatusUnrevieweden
uws.scholarLevelGraduateen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record


UWSpace

University of Waterloo Library
200 University Avenue West
Waterloo, Ontario, Canada N2L 3G1
519 888 4883

All items in UWSpace are protected by copyright, with all rights reserved.

DSpace software

Service outages