Show simple item record

dc.contributor.authorKamarah, Ehab
dc.date.accessioned2019-01-07 20:08:53 (GMT)
dc.date.available2019-05-15 04:50:09 (GMT)
dc.date.issued2019-01-07
dc.date.submitted2018-12-19
dc.identifier.urihttp://hdl.handle.net/10012/14324
dc.description.abstractPublic-Sector organizations such as School Boards and Universities are faced with significant challenges to keep their aging facilities operational and reducing the large backlog in infrastructure renewal needs. The cost to bring school and university facilities to acceptableand functional levels in Ontario is estimated to be as high as $15-billion and $2.5-billion, respectively. To address this challenge, Ontario government is investing hundreds of millions of dollars in infrastructure renewal every year. While significant literature efforts focused on determining efficient rehabilitation programs, little efforts addressed the delivery phase of such projects. Existing project management systems exhibit serious drawbacks when applied to infrastructure renewal projects that are mainly scattered and repetitive in nature. Planning such projects involves many challenges related to: the multi-location nature of the work (e.g., multiple schools); the need to synchronize multiple crews among multiple sites; the need to consider site productivity influences and work variations; the lack of timely progress tracking and corrective-action planning; and the ineffectiveness of current project delivery methods to handle this type of projects. Overall, existing systems lack the ability to provide near-optimum scheduling and delivery method to facilitate the execution of scattered repetitive projects. This research introduces an efficient framework for enhancing the planning, scheduling, control, and delivery arrangement of scattered repetitive projects. The framework combines the benefits of Line Of Balance (LOB), the Critical Path Segments (CPS), and optimization techniques to develop a schedule optimization model that takes into account various practical options and constraints, including: optional construction methods, variation of work quantities among sites, possible crew assignment strategies, practical productivity factors, activity-specific site execution order, in addition to deadline, resource limits, and crew mobilization constraints. First, a field study was carried out at two large organizations in Ontario, Canada, that manage a large number of facilities, to identify the practical challenges, work constraints, and the requirements for an efficient management system. Accordingly, the proposed framework was designed to address these needs. To support decisions during the construction phase, the proposed framework introduces an integrated CPS-LOB scheduling methodology that computes the number of crews to use, the method of construction to utilize, and the order of site execution, given any set of project constraints. For practicality, the scheduling model captures all mid-activity as-built events that enable optimum corrective action planning. This scheduling model is then applied within a Genetic Algorithms optimization procedure that tries millions of combinations of decisions until an optimum schedule is obtained, which meets all constraints at minimum cost. Moreover, the proposed scheduling and control model uses a new legible representation of scattered repetitive schedules to enable better communication of the schedule information among all project parties. To enable the use of the proposed framework in practice, this research introduced an innovative project delivery method called “Modified Construction Manager at Risk (MCMR)” to provide a suitable administrative and contractual environment that suit scattered repetitive projects. As opposed to all existing delivery practices, MCMR allows owner organizations to benefit from repetition and offer real opportunity to achieve significant cost savings. To demonstrate the capabilities and features of the proposed framework, a computer prototype system is developed, and its effectiveness validated using a real-life project. The results of the optimization experiments proved the suitability of the model to handle scattered repetitive projects. The proposed framework offers a powerful decision support features for contractors to make cost-effective decisions, while the proposed MCMR guidelines provide owners with the necessary contractual setup to make this happen. Overall, this framework has the potential to revolutionize the multi-billion-dollar business of infrastructure renewal and provide cost effective decisions that save tax payers’ money on the long run.en
dc.language.isoenen
dc.publisherUniversity of Waterlooen
dc.titleFramework for Scheduling, Controlling, and Delivery Planning for Scattered Repetitive Infrastructure Rehabilitation Projectsen
dc.typeDoctoral Thesisen
dc.pendingfalse
uws-etd.degree.departmentCivil and Environmental Engineeringen
uws-etd.degree.disciplineCivil Engineeringen
uws-etd.degree.grantorUniversity of Waterlooen
uws-etd.degreeDoctor of Philosophyen
uws-etd.embargo.terms4 monthsen
uws.contributor.advisorHegazy, Tarek
uws.contributor.advisorHegazy, Tarek
uws.contributor.affiliation1Faculty of Engineeringen
uws.published.cityWaterlooen
uws.published.countryCanadaen
uws.published.provinceOntarioen
uws.typeOfResourceTexten
uws.peerReviewStatusUnrevieweden
uws.scholarLevelGraduateen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record


UWSpace

University of Waterloo Library
200 University Avenue West
Waterloo, Ontario, Canada N2L 3G1
519 888 4883

All items in UWSpace are protected by copyright, with all rights reserved.

DSpace software

Service outages