Now showing items 1-3 of 3

    • Activity Analysis for Continuous Productivity Improvement in Construction 

      Gouett, Michael C. (University of Waterloo, 2010-08-30)
      In the construction industry, onsite labour is one of the most variable and costly factors which affect project profits. Due to the variable nature of construction labour and its correlation with profits, construction ...
    • Assessment Methods for Advanced Masonry Work Systems 

      Ryu, JuHyeong (University of Waterloo, 2021-03-19)
      The physically strenuous and demanding nature of construction tasks exposes workers to injury risks, can reduce productivity, and contributes to undesirable early retirement. In spite of these risks, human performance in ...
    • Setting Target Rates for Construction Activity Analysis Categories 

      Shahtaheri, Maryam (University of Waterloo, 2012-04-24)
      This thesis is focused on increasing productive actions in construction by a procedure known as Activity Analysis. Activity Analysis is a continuous productivity improvement tool for identifying barriers to site productivity ...

      UWSpace

      University of Waterloo Library
      200 University Avenue West
      Waterloo, Ontario, Canada N2L 3G1
      519 888 4883

      All items in UWSpace are protected by copyright, with all rights reserved.

      DSpace software

      Service outages