Title: Activity-Based Data Fusion for the Automated Progress Tracking of Construction Projects
Authors: Shahi, Arash
Keywords: Construction Management
Data Fusion
Progress Tracking
Activity Tracking
Field Implementation
Ultra Wide Band (UWB)
3D Laser Scanners
Approved Date: 9-Mar-2012
Date Submitted: 5-Mar-2012
Abstract: In recent years, many researchers have investigated automated progress tracking for construction projects. These efforts range from 2D photo-feature extraction to 3D laser scanners and radio frequency identification (RFID) tags. A multi-sensor data fusion model that utilizes multiple sources of information would provide a better alternative than a single-source model for tracking project progress. However, many existing fusion models are based on data fusion at the sensor and object levels and are therefore incapable of capturing critical information regarding a number of activities and processes on a construction site, particularly those related to non-structural trades such as welding, inspection, and installation activities. In this research, a workflow based data fusion framework is developed for construction progress, quality and productivity assessment. The developed model is based on tracking construction activities as well as objects, in contrast to the existing sensor-based models that are focussed on tracking objects. Data sources include high frequency automated technologies including 3D imaging and ultra-wide band (UWB) positioning. Foreman reports, schedule information, and other data sources are included as well. Data fusion and management process workflow implementation via a distributed computing network and archiving using a cloud-based architecture are both illustrated. Validation was achieved using a detailed laboratory experimental program as well as an extensive field implementation project. The field implementation was conducted using five months of data acquired on the University of Waterloo Engineering VI construction project, yielding promising results. The data fusion processes of this research provide more accurate and more reliable progress and earned value estimates for construction project activities, while the developed data management processes enable the secure sharing and management of construction research data with the construction industry stakeholders as well as with researchers from other institutions.
Program: Civil Engineering
Department: Civil and Environmental Engineering
Degree: Doctor of Philosophy
URI: http://hdl.handle.net/10012/6582
Appears in Collections:Faculty of Engineering Theses and Dissertations
Electronic Theses and Dissertations (UW)

Files in This Item:

File Description SizeFormat
Shahi_Arash.pdf5.82 MBAdobe PDFView/Open


This item is protected by original copyright

All items in UWSpace are protected by copyright, with all rights reserved.

 

University of Waterloo Library
200 University Avenue West
Waterloo, Ontario, Canada N2L 3G1
519 888 4883

contact us | give us feedback | http://www.lib.uwaterloo.ca | © 2006 University of Waterloo